Tasks: Reduction of noise disturbance in the large, long corridors of Building 54 through installation of both continuous and targeted illustrated soundproofing elements.
Project: Soundproofing Installation at Hotel Haus 54 in Zingst to "calm" the noise situation in the stairwell and corridors
Material: Filmolux Descor Premium with 6/0 digital print, Filmolux Descor Silencio (solid gray), Filmolux Descor Acoustic Fabric, Filmolux Descor Profile Strips. All materials B1 certified.
Execution: Production of wooden frames, installation of Filmolux Descor profile strips, outfitting with acoustic fabric, printing and installation of Filmolux Descor Premium with 6/0 digital print graphics, installation of Filmolux Descor profile strips on complete large wall surfaces in Hotel 54, and installation of Filmolux Descor Silencio (solid gray).